Lytle Associates

Architects in Guildford, Surrey

  • Home
  • About
    • People
    • Our clients
    • Working for us
    • Our vision & values
    • Employee Ownership Trust (EOT)
  • Portfolio
    • Heritage
    • Masterplanning
    • Education
      • Specialist Education Areas
    • Healthcare
    • Residential
    • Community
    • Retail/Commercial
  • News
  • Contact
  • Salesian School, Chertsey Education

Masterplans for both the main school and sixth form campuses, including stakeholder consultation, capacity and timetable analysis, condition reviews and phased development proposals, identifying both affordable small scale interventions and potential major new build projects.

First phases complete or in progress include:
Enabling projects to release new teaching space by rationalizing and refurbishing redundant changing room, storage and circulation space, maximizing use of existing space. Projects completed during summer holiday periods have delivered a sixth form study room, new classrooms, student toilets and changing rooms.

New T Level Block –
Completed autumn 2020. Fast track project delivered in 18 months from initial feasibility to completion, including successful DFE funding bid and planning permission.
6 new classrooms linked to the existing building with covered walkways at both levels, creating a collegiate courtyard feel to the sixth form campus.
Phase 2 to provide visual arts suite with art, photography and design studios.

Sports hall –
Planning achieved for new sports hall, changing and hospitality space, creating a new sports hub with viewing terrace at first floor.

Salesian School, Chertsey

Posted on February 24, 2021October 20, 2022

Masterplans for both the main school and sixth form campuses, including stakeholder consultation, capacity and timetable analysis, condition reviews and phased development proposals, identifying both affordable small scale interventions and potential major new build projects.

First phases complete or in progress include:
Enabling projects to release new teaching space by rationalizing and refurbishing redundant changing room, storage and circulation space, maximizing use of existing space. Projects completed during summer holiday periods have delivered a sixth form study room, new classrooms, student toilets and changing rooms.

New T Level Block –
Completed autumn 2020. Fast track project delivered in 18 months from initial feasibility to completion, including successful DFE funding bid and planning permission.
6 new classrooms linked to the existing building with covered walkways at both levels, creating a collegiate courtyard feel to the sixth form campus.
Phase 2 to provide visual arts suite with art, photography and design studios.

Sports hall –
Planning achieved for new sports hall, changing and hospitality space, creating a new sports hub with viewing terrace at first floor.

This entry was posted in . Bookmark the permalink.

Lytle Associates

Architects in Guildford, Surrey

Menu

Skip to content
  • Home
  • About
    • People
    • Our clients
    • Working for us
    • Our vision & values
    • Employee Ownership Trust (EOT)
  • Portfolio
    • Heritage
    • Masterplanning
    • Education
      • Specialist Education Areas
    • Healthcare
    • Residential
    • Community
    • Retail/Commercial
  • News
  • Contact
© 2023 Lytle Associates | Made by Deüce
  • Privacy Policy
  • Cookie Policy